Efficient Control of Scheduling and Costs

Avoid surface preparation-related disruptions during rehabilitation / construction due the disruptive and dusty conditions associated with ordinary abrasive blasting. Sponge Blasting reduced dust and abrasive ricochet which allows project managers to consolidate and schedule other trades to work in close proximity; tasks normally delayed can now be accomplished simultaneously to live Sponge Blasting; the effect… shortened and simplified project schedules, and reduced costs.


Testimonials

"[A] significant advantage is that other trades can work in the near vicinity of the Sponge-Jet blasting operation without having any safety concerns." - Managing Director, Favcote Pty. Ltd.


Related Resources

Recent Blog Posts

  • How to Remove Soot from Brick

    Fires can happen anywhere. While the cause of fires vary, every year thousands of homes, commercial properties, and industrial facilities deal with the cleanup after a blaze. In the aftermath of a fire, structural engineers and insurance companies will work together to determine if a property can be salvaged. In many cases, a fire restoration specialist will work with the owner to resurrect the property from the ashes. 

    Läs mer >
  • Lighthouse Restoration 101: Why Sponge Media is a Great Choice

    Lighthouses, once critical for safe international shipping and commerce have essentially been replaced with modern navigational tools such as radio beacons and GPS. Many lighthouses remain functional with working lanterns, used as a backup tool for mariners in instances where other navigational systems have failed. 

    Läs mer >
Fler inlägg