Efficient Control of Scheduling and Costs

Avoid surface preparation-related disruptions during rehabilitation / construction due the disruptive and dusty conditions associated with ordinary abrasive blasting. Sponge Blasting reduced dust and abrasive ricochet which allows project managers to consolidate and schedule other trades to work in close proximity; tasks normally delayed can now be accomplished simultaneously to live Sponge Blasting; the effect… shortened and simplified project schedules, and reduced costs.


Testimonials

"[A] significant advantage is that other trades can work in the near vicinity of the Sponge-Jet blasting operation without having any safety concerns." - Managing Director, Favcote Pty. Ltd.


Related Resources

Recent Blog Posts

  • How to Remove Soot from Concrete?

    When structural fires occur, they leave behind many hours of cleanup even if the fire doesn’t cause much structural damage. After fires, areas with affected masonry surfaces like concrete must be checked by a structural engineer to ensure entry is safe. Once the area is cleared, the restoration process can begin.

    Read More >
  • An Overview Guide on the Types of Fire Damage

    When fires occur, the immediate focus should be on preserving the health and safety of those in danger. Fire departments do amazing work saving lives and preventing fire spread throughout buildings and into nearby structures. Despite firefighters’ efforts, buildings often require robust cleaning of smoke, fire, and water damage in the aftermath.

    Read More >
More Posts